Construction

10 Marla House Construction Cost in DHA Lahore: 2026 Line by Line Breakdown

Real 2026 numbers for building a 10 marla house in DHA Lahore, grey structure, finishing tiers, fixtures, and where most clients quietly overspend.

Ahmed Raza

Head of Construction

March 8, 20269 min read

A 10 marla house in DHA carries a finish expectation that a 10 marla in a less established society doesn't. The build itself costs roughly the same, but the finishing tier most DHA clients choose pushes the total budget meaningfully higher.

Grey structure, 10 marla, double storey

  • Excavation, foundation, DPC: PKR 8 to 11 lac
  • Ground floor structure: PKR 22 to 28 lac
  • First floor structure: PKR 20 to 25 lac
  • Roof slab, mumty, plaster: PKR 14 to 18 lac
  • Grey structure subtotal: PKR 64 to 82 lac

Finishing, standard tier (basic but solid)

  • Tiles, flooring, marble skirting: PKR 14 to 18 lac
  • Electrical, switches, basic lighting: PKR 8 to 10 lac
  • Plumbing, sanitary, mid grade fittings: PKR 7 to 9 lac
  • Kitchen, wardrobes, woodwork: PKR 12 to 16 lac
  • Paint, false ceiling, finishing touches: PKR 7 to 9 lac
  • Standard finishing subtotal: PKR 48 to 62 lac

Finishing, premium tier (DHA typical)

  • Premium tiles, imported marble flooring: PKR 22 to 28 lac
  • Branded electrical, designer lighting: PKR 12 to 16 lac
  • Premium plumbing, branded sanitary: PKR 11 to 14 lac
  • Solid wood kitchen, custom wardrobes: PKR 22 to 30 lac
  • Texture paint, designer ceilings, finishing: PKR 10 to 14 lac
  • Premium finishing subtotal: PKR 77 to 102 lac

Total build cost, 10 marla DHA

Standard tier: PKR 1.12 to 1.44 crore. Premium tier: PKR 1.41 to 1.84 crore. Luxury or fully imported tier can push 2.2 crore+. These exclude boundary wall, gate, landscaping, and any structural premium for split level designs.

Where DHA clients overspend (unintentionally)

  • Mid construction design changes, every change order adds 2 to 4 weeks and 3 to 5%
  • Imported tiles ordered after the rate fluctuation locks in
  • Three rounds of kitchen revisions instead of a frozen final design
  • Underestimated landscaping and exterior finishing, often 8 to 12 lac extra

Lock the design before the foundation. Every change after that is paid for in rupees and weeks.

Ahmed Raza, Head of Construction

Tagged

#10 Marla#DHA#Construction Cost#Budgeting

Written by

Ahmed Raza

Head of Construction

Civil engineer with 15+ years of grey structure and finishing experience across Lahore.