Construction Cost Breakdown: What a 5 Marla House Actually Costs in Lahore (2026 Numbers)

Grey structure, finishing, electrical, plumbing, line by line costs from a contractor who's built dozens of these homes this year alone.

Ahmed Raza

Head of Construction

March 28, 20269 min read

Quotes from contractors swing wildly because no two builds are alike. But here's a realistic 2026 breakdown for a 5 marla, double storey home in Lahore with standard to mid finishing.

Grey structure (Q1 2026 averages)

  • Excavation and foundation: PKR 4 to 6 lac
  • DPC and ground floor structure: PKR 14 to 18 lac
  • First floor structure: PKR 12 to 15 lac
  • Roof slab, plaster, and external finishing: PKR 8 to 11 lac
  • Grey structure subtotal: PKR 38 to 50 lac

Finishing (standard to mid spec)

  • Tiles, flooring, and skirting: PKR 8 to 12 lac
  • Electrical wiring, fixtures, and switches: PKR 5 to 7 lac
  • Plumbing, sanitary, and fittings: PKR 4 to 6 lac
  • Kitchen, wardrobes, and woodwork: PKR 6 to 10 lac
  • Paint, false ceiling, and finishing: PKR 4 to 6 lac
  • Finishing subtotal: PKR 27 to 41 lac

Total expected build cost

Roughly PKR 65 to 91 lac for a complete 5 marla double storey in 2026, excluding boundary wall, gate, and external development. Premium finishes can push the upper end to PKR 1.1 crore.

If your contractor's quote is 30% below this range, ask exactly what's been cut. There's no such thing as a free lac.

Ahmed Raza, Head of Construction

Tagged

#Construction#Budgeting#5 Marla#Grey Structure

Written by

Ahmed Raza

Head of Construction

Civil engineer with 15+ years of grey structure and finishing experience across Lahore.